October 2012

 Scroll down For Today and this Month
_______________________________________
10/31/2012
add
stairwell done, now texture all upstairs
________________________________________
10/30/2012
add
Sanding
Fall 2012
Fall is here
________________________________________
10/29/2012
add
Second coat
_________________________________________
10/28/2012
add
Stairwell done with first coat.
__________________________________________
10/27/2012
More Mud, no picture.
_______________________________________
10/26/2012
add
More of the same, just a bit more to go, then texture.
________________________________________
10/25/2012
add
Half way on the second coat of mud
________________________________________
10/24/2012
add
Sanding
_______________________________________
10/23/2012
snow
First Snow
________________________________________
10/22/2012
fire add
De ja vu, or Ground Hog Day, your pick.
Burned trash, everything we could find.  Fixed broken pipe again (same pic) no kodak moment.
________________________________________
10/21/2012
add
Tape is up, upstairs.  Now sand, then second coat of mud.
_________________________________________
10/20/2012
addadd
Clean up day.
________________________________________
10/19/2012
add
Burn construction trash.
add
Fix a leak in the water line.
_______________________________________
10/18/2012
add
More mud and tape.
_________________________________________
10/17/2012
add
408 ft of tape, over 70 lbs. of mud in one day, that is a lot of wrist work.
__________________________________________
10/16/2012
add
More tape and mud, many more days to go.
10/15/2012
add add
More taping and mudding.
_______________________________________
10/14/2012
add
Primed the north side of the house.
_______________________________________
10/13/2012
add
Made a tape mud dispenser, puts mud on the paper tape when you pull it through.
_______________________________________
10/12/2012
add
First block, 10 to go.
add
Ready to start the chimney
____________________________________________
10/11/2012
add add
I inspect the chimney, Karen inspects the platform.
_______________________________________
10/10/2012
fig jam
Made Fig Jam
TH
Reworked the Tank House valves.
apple sauce
Made 21 quarts of apple sauce
_________________________________________
10/09/2012
add
Started work on chimney
________________________________________
10/08/2012
  knee  med
Went to the doctor, got x-rayed, got meds, my knee does not look that good.
_______________________________________
10/07/2012
add
Rock is up
_________________________________________
10/06/2012
add
Some stone in.
add
First coat of plaster, scratch coat next.
_______________________________________
10/05/2012
add
Ready to plaster.
_______________________________________
10/04/2012
add
Rejoined the walkway
_______________________________________
10/03/2012
Dixie
Dixie being good, short lived moment.
add
Poured concrete drain for walkway
__________________________________________
10/02/2012
wine wine
Pressed wine.  31.5 gallons
________________________________________
10/01/2012
add add
Repaired Wet Rot in the floor
add
Steel corners are up.

Happy Birthday,  We Love You!
Kristina