10/31/2018

More walkway forms
_____________
10/30/2018

Cleaned Wood Shop
______________
10/29/2018

Cleaned Machine Shop
_____________
10/28/2018

Cleaned, Repaired, Sharpened and Lubricated Chain Saws
___________
10/27/2018

Put Theroseal on the walls of the ramp
_____________
10/26/2018

Stripped Forms and Clean Up
___________
10/25/2018

More Concrete Walkway Poured.
__________
10/24/2018

Poured more walkway
______________
10/23/2018
   
Clean Up, Moved Rock, Worked on cases for test modules.
____________
10/22/2018

Poured More walkway
______________
10/21/2018
   
Made forms and poured three small concrete slabs
___________
10/20/2018

Another 8,000lb of Concrete mix, Plastered wall of Ramp to Tank House
____________
10/19/2018

Poured more walkway
___________
10/18/2018

Poured Concrete Ramp
___________
10/17/2018

Printed Case for Key Pad, Rest
___________
10/16/2018
 
More Concrete Forms, to tank house.
__________
10/15/2018

Printed 3D Case for new Radio
__________
10/14/2018

Rest!
____________
10/13/2018

Robot Club
_______________
10/12/2018

Forms for Ramp to Tank House, and rock!
___________
10/11/2018

Behind the tank house poured
____________
10/10/2018

All the wood cut and split
 
Tank House sides done
____________
10/09/2018

More Sand and Gravel

 
Forms for Tank House
____________
10/08/2018

Poured More Concrete Behind Little House
___________
10/07/2018

Clean up
___________
10/06/2018

Concrete behind little House
____________
10/05/2018

Log deck getting smaller, more wood cut and split
__________
10/04/2018

Concrete behind Machine Shop
___________
10/03/2018
 
Doctors, Got 4500lbs of Concrete mix and almost got home.  Lost Bearings somewhere.
___________
10/02/2018
 
 
Poured and finished Four Pieces of Concrete
__________
 10/01/2018

Poured concrete behind garage